Here is the modified layout proposed for the bathroom. We were told this week (1 month after the targeted completion date of 15-JAN-2020) that the custom tile shower could not be completed as originally planned but that making the switch to this layout would expedite the job.
As you can see, its a pretty simple design. The fixtures in both baths are identical.
